| MOQ: | 1 |
| Price: | 100000 |
| No. | Structure | Strand diameter (mm) | Strength (MPa) | Marks |
|---|---|---|---|---|
| 1 | 1+6 | Φ9.53 | ≥1860 | |
| 2 | 1+6 | 12.7 | ≥1860 | |
| 3 | 1+6 | 15.2 | ≥1860 | |
| 4 | 1+6 | 17.8 | ≥1860 |
Each group contains 7 pcs Φ1250 bobbins with motor drive unit set.
Synthesized formwork includes dies suitable for different sizes, with adjustable longitudinal position via manual screw regulation.
Forming device's forming wheel allows manual fine adjustment. Features cylinder opening for easy operation, reliable running, and prevention of wire strand scattering.
| No. | Name | Quantity | Note |
|---|---|---|---|
| 1 | Stranding machine | 1 | |
| 2 | Synthesized Die | 1 | |
| 3 | Forming | 1 | |
| 4 | First tension device | 1 | |
| 5 | Medium frequency furnace | 1 | |
| 6 | Water cooling trough | 1 | |
| 7 | Second tension device | 1 | |
| 8 | Constant tension device | 2 | |
| 9 | Pay off and take up | 2 | |
| 10 | Wire arranging | 1 | |
| 11 | Layer winding | 1 | |
| 12 | Control system | 1 |
Continuous working system without stops during holidays. Machine operates 3 shifts per day with annual examination and repair system.
| Working system | Total hours per year (h) | Plan stop time (h) | Working hours (h) | Non-planned stop time (h) | Annual efficient working time (h) |
|---|---|---|---|---|---|
| Three shifts | 8760 | 576 | 8184 | 1364 | 6299 |
Note: 1. Annual day is 365 days. 2. Plan repair days calculated as 2 days/month.
| MOQ: | 1 |
| Price: | 100000 |
| No. | Structure | Strand diameter (mm) | Strength (MPa) | Marks |
|---|---|---|---|---|
| 1 | 1+6 | Φ9.53 | ≥1860 | |
| 2 | 1+6 | 12.7 | ≥1860 | |
| 3 | 1+6 | 15.2 | ≥1860 | |
| 4 | 1+6 | 17.8 | ≥1860 |
Each group contains 7 pcs Φ1250 bobbins with motor drive unit set.
Synthesized formwork includes dies suitable for different sizes, with adjustable longitudinal position via manual screw regulation.
Forming device's forming wheel allows manual fine adjustment. Features cylinder opening for easy operation, reliable running, and prevention of wire strand scattering.
| No. | Name | Quantity | Note |
|---|---|---|---|
| 1 | Stranding machine | 1 | |
| 2 | Synthesized Die | 1 | |
| 3 | Forming | 1 | |
| 4 | First tension device | 1 | |
| 5 | Medium frequency furnace | 1 | |
| 6 | Water cooling trough | 1 | |
| 7 | Second tension device | 1 | |
| 8 | Constant tension device | 2 | |
| 9 | Pay off and take up | 2 | |
| 10 | Wire arranging | 1 | |
| 11 | Layer winding | 1 | |
| 12 | Control system | 1 |
Continuous working system without stops during holidays. Machine operates 3 shifts per day with annual examination and repair system.
| Working system | Total hours per year (h) | Plan stop time (h) | Working hours (h) | Non-planned stop time (h) | Annual efficient working time (h) |
|---|---|---|---|---|---|
| Three shifts | 8760 | 576 | 8184 | 1364 | 6299 |
Note: 1. Annual day is 365 days. 2. Plan repair days calculated as 2 days/month.